  Honmoku PIER  

map

Honmoku Pier was constructed between 1963 and 1970 with four jetties, A through D, in a comb-like shape. Honmoku Pier has since assumed the role as the Port of Yokohama's core pier accommodating various types of vessels from full-container ships and conventional ships to RO/RO ships.

Included in the total of 25 berths are 3 container berths and 5 multi-purpose berths under the mamagement of the City of Yokohama, and 6 container berths run by the Yokohama Port Development Public Corporation(Y.P.D.C.)

In 2009, cargo handling volume was 29,328,642 tons.

In response to the growing size of container ships, the water area between Jetties B and C was reclaimed, and, with the completion of first-phase project area, a new container terminal began operation in April 1996. The second-phase reclamation started in 1998 to construct a 15m-deep quay (earthquake-resistant) at the tip and container yard was opened in 2005. As soon as the yard was opened, this area was reborn as a container terminal with excellent transshipment capabilities as it is accessible to both small and large ships.


We are now working on redevelopment plans for Jetty D to further enhance this pier's functions.

The Port of Yokohama Symbol Tower and the Honmoku Fishing Jetty, recreational facilities open to the public, are located on Jetty D.

Access
Honmoku Futo Junction on Coastline Highway
Area
287.7ha

Jump to

>> Click Here for the Guide Map.




Public Facilities

  • Conventional Berths
Berth Length(m) Apron Width
(m)
Depth(m) Mooring Capacity
(D/W)
A jetty A-1 200 20.0 10.0 15,000
A-2 200 20.0 10.0 15,000
A-3 200 20.0 10.0 15,000
B jetty B-1 200 20.0 10.0 15,000
B-2 200 20.0 10.0 15,000
B-3 200 20.0 10.0 15,000
B-4 200 20.0 10.0 15,000
B-5 200 20.0 10.0 15,000
Building Material Quay 1 185 20.0 10.0 12,500
Building Material Quay 2 145 20.0 9.0 5,000
TOTAL 1,930 -

  • Container Berths

Berth Length
(m)
Depth
(m)
Moorning
Capacity
(D/W)
Gantry Crane CFS
(m2)
CY
(m2)
Reefer
Soket
NO. Rated
Load(t)
C-Jetty
(multi-purpose)
C-5 200 13.0 15,000 2
1
4
30.5
33.5
40.5
- 76,518 -
C-6 200 13.0 15,000
C-7 200 13.0 15,000
C-8 200 13.0 15,000
C-9 200 13.0 15,000
D-Jerry
(Weight cargo)
D-1 200 11.0 15,000 4 30.5 *2: 8,032
LFS*1: 6,696
167,294 348
D-2 200 11.0 15,000
D-3 220 11.0 15,000
TOTAL 1,620 - 6
1
4
30.5
33.5
40.6
14,728 243,812 348

  • Landing Platforms, Sheds, Handling Areas

Landing Platforms 11 Total Length 2,262m, Widht 10m, Depth 2.5-5.0m
Sheds 19(inc. 2 CFS) Usable Area 59,995m2
Handling Areas etc. 56 354,569m2
breakdown 36 Handling Areas 168,424m2
5 Container Terminals 167,294m2
15 Conventional Cargo Terminals 18,851m2

Yokohama Port Development Public Corporation Facilities

Berth Length(m) Depth
(m)
Moorning
Capacity
(D/W)
Gantry Crane CFS
(m2)
CY
(m2)
Reefer
Soket
Handling
Method
NO. Rated
Load(t)
A Jetty A-5 300 13.0 35,000 2 30.5 - 125,000 320 Transfer Crane
A-6 300 13.0 35,000 2 30.5 5,992 96,000
A-7 250 13.0 25,000 2 30.5 4,033 81,000 246 Transfer Crane
A-8 250 13.0 25,000 2 30.5 5,598 84,000 186 Transfer Crane
D Jetty D-4 300 14.0 40,000 3 40.6 5,329 105,000 200 Transfer Crane
D-5 300 15.0 60,000 3 40.6 3,284 105,000 166 Transfer Crane
TOTAL 1,700 - 14 30.5/40.6 24,236 596,000 1,118 -